14+ years on both sides of the process: on EPD preparation teams and in the independent verifier's seat. We build your study knowing which questions verification will ask.

First consultation is free · Replies within one business day · Remote, international

İpek Göktaş Kalkan
  • ArcelorMittal
  • Holcim
  • KONE
  • Huntsman
  • Peikko
  • Çimsa
  • Master Builders Solutions
  • Georg Fischer
  • IKO
  • Finnfoam
  • Hoffmann Green Cement
  • Ege Seramik

14+

Years of experience

200+

EPDs authored / verified

4

Verifier platforms

3

Continents: Europe, Asia, Americas

Three sentences from the field

Sound familiar?

“We thought an EPD was a certificate”

Many companies assume an EPD declares their product “green”. An EPD is not an endorsement — it is a transparent declaration. If that expectation is not corrected at the start, the process ends in disappointment.

“We've been stuck in verification for months”

Comment, revision, another comment... As verification loops multiply, the timeline stretches. The problem usually starts not in verification, but in data collected months earlier.

“Our data is scattered — where do we start?”

Energy invoices in one place, recipes in another, waste records missing. The least predictable part of the process is not verification — it is data collection.

We hear these three sentences on projects of every size. All three have the same cure: starting the process through a verifier's eyes.

The solution

We answer verification questions before they are asked

From data collection templates to allocation decisions, from background data selection to end-of-life scenarios — every step of the study is built knowing what will be scrutinised at the verifier's desk. Revision loops shrink; the timeline becomes predictable.

  • 200+ EPD projects on both sides of the process
  • Approved verifier on four programme operators
  • EN 15804+A2 · ISO 14025 · ISO 14040/44 · ISO 21930

Approved verifier on

  • The International EPD® System
  • EPD Hub
  • EPD Global (Powered by EPD-Norway)
  • Rakennustieto RTS EPD

A typical verification comment

“A1 raw material data is from 2019 and does not match the declared reference year. Data for the current production year has been requested.”
Comments like this add weeks to the process. In the studies we prepare, this question is answered at project start — before it ever reaches the verifier.

Example comment type from real verification practice — contains no project information.

Services

Experience on both sides of the process: as an author and as a verifier.

What the market demands — and the answer

An EPD is no longer “nice to have” — it is the common denominator of exports, tenders and the incoming regulatory wave.

EU Construction Products Regulation (CPR)
EN 15804+A2-compliant, verification-ready EPD preparation
CBAM — Carbon Border Adjustment Mechanism
Product-level emissions data and carbon footprint support
LEED / BREEAM credits
Verified EPDs that earn points in green building projects
Tender and project specifications
Declarations that have passed independent third-party verification
Digital Product Passport (DPP)
A life-cycle data infrastructure built through the EPD
İpek Göktaş Kalkan

From someone who knows both sides of the process

Hello, I'm İpek. I have been working with EPD, LCA and sustainable building products for over 14 years. Throughout my career I have sat on both sides — preparing EPDs and verifying them independently. And I have seen this: the cause of a weak EPD is almost never the verification itself, but the data decisions made months earlier. I founded EPDlogy so that manufacturers can run this process in a way that is clearer, more controlled and verification-ready from day one.

İpek Göktaş Kalkan · Independent EPD Verifier & LCA Consultant

About →

Frequently Asked Questions

Everything you need to know about EPD verification and LCA consultancy.

What is EPD verification?

EPD verification is a mandatory independent review of an EPD before it can be published. A qualified third-party verifier checks that the LCA model, data, assumptions and report comply with the relevant PCR and EN 15804+A2.

How long does EPD verification take?

Typically 2–4 weeks, depending on the complexity of the product and the completeness of the documentation submitted. Clean, well-prepared studies move fastest.

Which EPD programmes do you verify for?

The International EPD® System, EPD Hub, EPD Global and Building Information Foundation RTS (Finland).

What is the difference between EPD preparation and EPD verification?

EPD preparation involves conducting the LCA and writing the EPD report. EPD verification is the independent review of that report by a qualified third party before publication. EPDlogy offers both — but never for the same project, to preserve verifier independence.

What product types can you verify?

Steel, aluminium, concrete, insulation, facade systems, windows, flooring, ceiling systems, furniture, plastics, paints and more. Experience across a wide range of construction product categories.

All questions →

Let's talk about your EPD

Tell us about your product and target market; we will come back with a clear roadmap.

Get a Free Consultation

First consultation is free · Reply within one business day